fujitsugeneral Cover2.png

Grand Slam Offer

AirStage Cloud Experience

 UI Design, UX Design, Design System - 2022

AirStage Cloud Project consisted of a Migration from Sketch to Figma with a full Redesign & creating of a New Design System for smart components.

Project
Air Stage Cloud Experience & Design System

Client
’Fujitsu’ formally ‘Ventacity Systems’

Role
Lead UI/UX Designer

Duration
1 Year

Tools
Figma, Figjam, Maze

Platform
Web Platform

Deliverables
Wireframes
User Flows
UI Design System
Invision Prototype
High fidelity Designs
User testing (maze)

Discovery

For each section, we followed the process that I defined where we filled out a simple brief, for a reference point for the area. From there we again conducted some discoveries before jumping right into the design. This proved very valuable for myself & the team to get a better insight into the sections we are designing for.

Understand & Explore

Here are a few sections showcasing explore work, very messy but so much has been clarified and new flows explored and setting us up nicely for Materialization.

Materialize

AirStage Cloud Experience

As a team, we materialized all of our flows for the Airsatge platform to a Hifidetlity state where we prototyped each flow and conducted User testing using mase to validate each section before moving to development.

We delivered 14 sections with +180 High fidelity screens within this project & hundreds more within the exploration stage. I worked on the first 2 sections to define a Process for other team members to work on each session. I then set out a roadmap for the team to work on some of the following sections. I overseed all sections helped on the UI front & revised work I owned 6 sections from start to completion.

ASCX - Design System

I & the team created a design system from scratch in Figma with smart components with auto layout an variants, taking full advantage of Figma. In the DS we included colors & styles, typography, branding, and a grid system. From small atom components to compiled with many variables. The DS had over 70+ Components (This was a great project that required a lot of iteration.)  

Thanks for reading.